drill 7/7.
higher grade zones within lower grade envelopes - large areas.
no overburden = greatly reduced extraction costs = even 150ppm economic... considering significant tonnage.
initial drills to 30m = about 1 hour per hole = jorc on first target zone (first of many at Lake Surprise) by as early as end August.
forget ppm as probably widespread low grade. get the calculator out and focus on huge tonnage into $ / pound into value.
re-ratings on the horizon
- Forums
- ASX - By Stock
- PKT
- all good
PKT
pocketmail group limited
all good
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)