drill 7/7.
higher grade zones within lower grade envelopes - large areas.
no overburden = greatly reduced extraction costs = even 150ppm economic... considering significant tonnage.
initial drills to 30m = about 1 hour per hole = jorc on first target zone (first of many at Lake Surprise) by as early as end August.
forget ppm as probably widespread low grade. get the calculator out and focus on huge tonnage into $ / pound into value.
re-ratings on the horizon
PKT
pocketmail group limited
drill 7/7.higher grade zones within lower grade envelopes -...
Add to My Watchlist
What is My Watchlist?