88E 50.0% 0.3¢ 88 energy limited

Was a good PPt. Interesting to see the check list in the...

  1. 2,776 Posts.
    lightbulb Created with Sketch. 602
    Was a good PPt. Interesting to see the check list in the summary.

     Many variables impact productivity of source-reservoired oil and gas
    o Organic geochemistry
    o Thermal and tectonic history
    o Petrophysics
    o Geomechanics
    o Drilling and completion practices

     Development of North Slope shale oil will likely depend on
    o Successful exploration drilling, data gathering to establish geological favorability
    o Successful production pilot project(s)
    o Lowering drilling and operating costs
    o All-season roads for year-round surface access to new areas
    o More hydraulic frac crews
    o Sufficient water supplies for frac make-up fluid
    o Factual understanding and operator transparency regarding frac practices

    These methods use a *#$@load of water and sand!! A very cost intensive process. These upcoming results are going to have to be as good (spectacular) as the preceding.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(50.0%)
Mkt cap ! $86.67M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $10.05K 3.566M

Buyers (Bids)

No. Vol. Price($)
152 214316072 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 581110328 194
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.