VIL 0.00% 1.6¢ verus investments limited

all ready for rig sd

  1. 1,477 Posts.
    lightbulb Created with Sketch. 1
    Mentioned in XStates 1/4 report
    nothing new, but site is "well prepared" for drill & Rig.
    Lets hope next week!

    Preparations Continue for drilling the large Sidi Dhaher Prospect

    XState advised during the quarter that the mobilisation of the Challenger rig to the Sidi Dhaher well
    site has been delayed due to concerns for the safety of local rural residents. The Operator continues
    to actively prepare, in conjunction with Tunisian and local authorities and the local community, for
    mobilisation of equipment for the drilling of Sidi Dhaher 1 well.
 
watchlist Created with Sketch. Add VIL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.