Mentioned in XStates 1/4 report
nothing new, but site is "well prepared" for drill & Rig.
Lets hope next week!
Preparations Continue for drilling the large Sidi Dhaher Prospect
XState advised during the quarter that the mobilisation of the Challenger rig to the Sidi Dhaher well
site has been delayed due to concerns for the safety of local rural residents. The Operator continues
to actively prepare, in conjunction with Tunisian and local authorities and the local community, for
mobilisation of equipment for the drilling of Sidi Dhaher 1 well.
- Forums
- ASX - By Stock
- VIL
- all ready for rig sd
all ready for rig sd
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)