Double Bay
from the announcement:
Open flow rates after acid stimulation increased by a factor of ten from a natural open flow rate of 29 Mcf/day to over 300 Mcf/day. (FOR THE OTHER INVESTORS WELL)
„h The Aus-Tex PC1 (The Wilkerson 2A) gas well is now scheduled for acid stimulation and pipeline connection this week. This well was originally drilled in November 2007 and produced a natural open flow rate of 265 Mcf/day.
(OUR WELL).
In both references they talk of "natural open flow rate" - other investor is 29Mcf, ours is 300 Mcf - both before stimulation.
That's the way I read it.
- Forums
- ASX - By Stock
- AKK
- all take note.......
all take note......., page-40
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)