http://www.smallcappower.com/articles/economic_analysis_of_mineral_deposits_part_III_October_2010.html
The article above is rather interesting. It includes information from the feasibility study prepared in 1983, including the capex required to build a 2mtpa and 4mtpa wash plant on the original hinton project.
Apparently the author of the article performed DD on the project for one of his clients prior to XEN acquiring the project. He estimates that a 2mtpa plant would now (2008) cost $200m, and that an 8mtpa plant would cost $449m, demonstrating significant economies of scale for an expanded large scale project.
Interesting read to kill some time before TSX listing.
Good luck to holders.
- Forums
- ASX - By Stock
- all times highs !!!
http://www.smallcappower.com/articles/economic_analysis_of_minera...
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPL (ASX) to my watchlist
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.33M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated