AKE 0.00% $9.83 allkem limited

Allkem General Discussion, page-81

  1. 13,229 Posts.
    lightbulb Created with Sketch. 8048
    G'Day FG,

    Here are some rough numbers as a starting point...

    Naraha:
    10ktpa Hydroxide
    = circa 8800tpa LCE

    Using an estimate of about 0.9kg LCE per kWh:
    8800tpa / (0.9kg / 1000kg/t) / (1000000kWh/GWh) = 9.78 GWh
    Say about 10GWh...?

    Not sure what the capacity of the Toyota plant will be though:

    https://hotcopper.com.au/data/attachments/3872/3872496-2e7aa4ba77b6aeafcc5b856aad992254.jpg
    https://www.autoevolution.com/news/toyota-will-spend-129-billion-to-build-lithium-ion-battery-plant-in-north-carolina-175913.html



    If, say, the 200,000 "hybrids" each had a 20kWh battery pack (e.g. Rav4 Prime @ 18kWh), then that would be about 4GWh...?

    Sounds like an expansion of the factory (to multiple production lines as stated in the article above) could easily consume the output of Naraha....?


    That may help a bit...
    Cheers
    Last edited by GCar: 08/12/21
 
watchlist Created with Sketch. Add AKE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.