On the drilling front, Central aims to re-enter its Surprise-ST1 well late this month to speed up a
program over the next 6-12 months focused on the re-entry and testing of the well, which has 10
million barrels of oil in place on a P50 basis.
Central aims to test both the conventional and unconventional horizons of the well.
Other wells planned before year?s end include the drilling of Kitty-1, a condensate and gas
prospect and the drilling of Madigan-1, the first well on a ?giant structure? in the Perdika Basin
thought to have oil in place potential of more than 4 million barrels based on preliminary mapping
of new seismic acquired in 2010.
* Still no real answers! He must have an Ace up his sleeve surly. We hope lol.
- Forums
- ASX - By Stock
- almost there
On the drilling front, Central aims to re-enter its Surprise-ST1...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
-0.001(1.85%) |
Mkt cap ! $39.49M |
Open | High | Low | Value | Volume |
5.4¢ | 5.5¢ | 5.3¢ | $12.07K | 219.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 163385 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 300000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 163385 | 0.053 |
4 | 308254 | 0.052 |
3 | 536685 | 0.051 |
5 | 475000 | 0.050 |
1 | 150000 | 0.045 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 300000 | 1 |
0.058 | 581768 | 2 |
0.060 | 99559 | 2 |
0.069 | 200000 | 1 |
0.070 | 130000 | 2 |
Last trade - 15.44pm 01/11/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |