Last report were going to run liner to deal with high pressures. This was expected to take 2 to 3 days. Then have 122 metres to drill. Liner should have been completed by Saturday at the latest, so must be there now.
News today or tomorrow?
- Forums
- ASX - By Stock
- TEX
- already there you think
already there you think
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)