Last report were going to run liner to deal with high pressures. This was expected to take 2 to 3 days. Then have 122 metres to drill. Liner should have been completed by Saturday at the latest, so must be there now.
News today or tomorrow?
Last report were going to run liner to deal with high pressures....
Add to My Watchlist
What is My Watchlist?