As long as it is built correctly the first time I am happy if it takes a bit longer if that is what is needed. A rushed job only presents issues in my experience and can push commissioning times way out. We will be producing soon and duely rewarded. Offtakes are in place. Doubling capacity and drilling underway to increase reserves is better than I had hoped for and all to be revealed soon. Happy to be here!
- Forums
- ASX - By Stock
- 1MC
- Altura Mining Twitter
Altura Mining Twitter, page-892
-
-
- There are more pages in this discussion • 417 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
-0.001(3.33%) |
Mkt cap ! $7.852M |
Open | High | Low | Value | Volume |
3.0¢ | 3.0¢ | 2.9¢ | $2.761K | 92.26K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 412931 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 60215 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 412931 | 0.029 |
1 | 10000 | 0.028 |
1 | 61938 | 0.027 |
2 | 134223 | 0.026 |
2 | 110000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 60215 | 2 |
0.031 | 8000 | 1 |
0.032 | 92168 | 2 |
0.033 | 378549 | 3 |
0.034 | 284705 | 4 |
Last trade - 15.51pm 27/09/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |