ASQ 0.00% 3.6¢ australian silica quartz group ltd

By 2013 aluminium production is expected to be around 50.4m...

  1. 132 Posts.
    By 2013 aluminium production is expected to be around 50.4m tonnes and consumption is predicted to be at 52.4 million tonnes. Laeving a deficit of 2m tonnes. Accordingly it takes around 4.5 - 5.0 mill tonnes of Bauxite to make 1 tonne of Aluminium. Current annual production levels world wide are 190mill tonnes of bauxite . This needs to increase to 226.8 - 252mill tonnes bauxite annually to meet forecast production demands or
    235.8 -262.0 mill tonnes annually to meet consumption demands. If Australia maintains its world wide annualised rate of 34% bauxite production ,to keep up with production Australia needs to increase production by 12.24 - 21 mill tonnes bauxite annually. On the consumption side Australia needs to increase production by 15.57 - 24.48 mill tonnes bauxite annually. Anyway cheers for now and as always, please do your own research .
 
watchlist Created with Sketch. Add ASQ (ASX) to my watchlist
(20min delay)
Last
3.6¢
Change
0.000(0.00%)
Mkt cap ! $10.14M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 4689 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.7¢ 217500 1
View Market Depth
Last trade - 16.12pm 18/06/2024 (20 minute delay) ?
ASQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.