I think those figures are for silica that is smeltered. For straight out of the ground and delivered for smelting, brickworks is using the numbers that were reported to the ASX when MHM first came across the silica project, although I thought it was $400-$600, but splitting hairs.
- Forums
- ASX - By Stock
- VYS
- aluminium plant commissioning and silica drill
aluminium plant commissioning and silica drill, page-33
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VYS (ASX) to my watchlist
(20min delay)
|
|||||
Last
39.0¢ |
Change
0.015(4.00%) |
Mkt cap ! $163.2M |
Open | High | Low | Value | Volume |
37.5¢ | 39.0¢ | 37.5¢ | $67.22K | 177.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 40461 | 37.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
39.0¢ | 11786 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 40461 | 0.375 |
4 | 44900 | 0.370 |
2 | 108888 | 0.365 |
3 | 42888 | 0.360 |
5 | 78551 | 0.355 |
Price($) | Vol. | No. |
---|---|---|
0.390 | 11786 | 1 |
0.400 | 17991 | 1 |
0.410 | 287552 | 1 |
0.420 | 178147 | 4 |
0.425 | 424858 | 4 |
Last trade - 16.10pm 19/08/2024 (20 minute delay) ? |
Featured News
VYS (ASX) Chart |