NRZ 0.00% 1.3¢ neurizer ltd

am i the only nutter still holding?, page-14

  1. 476 Posts.
    lightbulb Created with Sketch. 99
    Gidday Mistermoon,

    Depending on ground conditions you might expect about 30m per day of diamond drilling. The core will be halved and logged on site. Probably sent to the lab on a weekly basis as there is a transport truck that regularly goes to Beverly mine and Arkaroola. How busy the laboratory is another factor, about 2 weeks +- there, then results probably on a per hole basis. As the hole depth varies from 200m to 400m it will take about 3-4 weeks for the first results, as you said.

    All the best
    Opaldigger

    I hold mtn.
 
watchlist Created with Sketch. Add NRZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.