Looks like a weather event. Perhaps the network was at it's most sensitive bushfire mitigation setting as a precaution. Time will tell. Possible scenario: Passing storm and lightning strikes caused two transmission lines to trip. Resulting in Loy Yang A having no connection to market so it trips to protect itself. Triggering rolling blackouts to further protect infrastructure.
EMO ELECTRICITY MARKET NOTICE. Significant power system event – 13 Feb 2024At 1308 hrs 13/02/2024 a significant power system event occurred. Description of event – Multiple tripping of generation and transmission lines in the Vic region Transmission element(s) tripped – Moorabool Sydenham No1 and No2 500 kV lines tripped Region/s – VicLoad interrupted – in excess of 1000 MW Generation volume tripped – 2300 MW Updates will be provided as additional information becomes available. This Market Notice is issued in accordance with NER clause 4.8.3. Manager NEM Real Time Operations