The pilot plant is up and running at Molo:
Energizer Resources (T.EGZ) up 12% on pilot plant testing
Elizabeth Walters, Stockhouse
0 Comments| 3 hours ago
Add to Favourites
Stockhouse Canadian Small and Micro-cap Stock Report for Thursday, October 17, 2013 VANCOUVER (SHfn) –
Energizer Resources Inc. (TSX: T.EGZ, Stock Forum) rose 12% to 14 cents on Thursday after the mineral exploration and development company said that it has commissioned and started up the pilot plant for its flagship Molo graphite project in Madagascar. Mechanical commissioning of the Molo graphite project pilot plant has been completed and two continuous 80-hour campaigns to optimize metallurgical conditions will be completed in the next 30 days. The pilot plant was designed, built, and is being operated by SGS Canada Inc. (SGS) in Lakefield, Ontario. Two hundred tonnes of composite graphite ore was transported last month from the Molo deposit via existing, serviceable infrastructure to SGS in preparation for the pilot plant. Representatives from Caracle Creek International Consulting were on site to ensure the ore extracted from the Molo deposit was a true representative sample of the mill feed that will eventually be treated in the future processing plant and that it would satisfy the required standards for use in the upcoming Bankable Feasibility Study (BFS). The company expects the pilot plant to produce between seven to nine tonnes of finished, flaked graphite concentrate within the next 30 days.
Read more at http://www.stockhouse.com/news/micro-cap-report/2013/10/17/energizer-resources-(t-egz)-up-12-on-pilot-plant-t#506Ts3qCJu5cqzUs.99
I wonder is the MGY staff remembered to turn off the lights when they left the office!!
Cheers
R1
The pilot plant is up and running at Molo:Energizer Resources...
Add to My Watchlist
What is My Watchlist?