I think you'll find the frame post are screw pile types with no need for concrete like slide 15 of the AGM presentation. Just get the land scratched flat, survey the grid lines and positioning of screw piles and off you go.
A drill rig type setup for screw piling.
Plug & play so to speak.
Precast concrete for the footings of the battery room or plant room. The need for pouring concrete on site these days is over in a lot of instances. Grey gold they call it, the concrete guys.
- Forums
- ASX - By Stock
- An announcement before Christmas would be nice
I think you'll find the frame post are screw pile types with no...
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
0.002(3.92%) |
Mkt cap ! $16.58M |
Open | High | Low | Value | Volume |
5.2¢ | 5.3¢ | 5.2¢ | $4.614K | 87.23K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6879 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 101160 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6879 | 0.053 |
2 | 25556 | 0.052 |
3 | 86939 | 0.051 |
10 | 746388 | 0.050 |
5 | 212727 | 0.049 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 101160 | 2 |
0.055 | 138140 | 3 |
0.056 | 200000 | 1 |
0.057 | 360000 | 5 |
0.059 | 155000 | 2 |
Last trade - 15.45pm 26/04/2024 (20 minute delay) ? |
|
|||||
Last
5.3¢ |
  |
Change
0.002 ( 3.92 %) |
|||
Open | High | Low | Volume | ||
5.3¢ | 5.3¢ | 5.3¢ | 8821 | ||
Last updated 14.09pm 26/04/2024 ? |
Featured News
CCE (ASX) Chart |