Anaconda, page-7

  1. 91 Posts.
    Sherritt were responsible for the feasibility study matey. They also performed testwork & supplied the preliminary design for the plant.
    Sherritt & Fluor then worked in conjunction on the design of the plant.


    All the best

    Guardian
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.