A well-put and measured post, Robo,as always. The methodical and precise approach towards production by Steve & his team is commendable, and I certainly dont mean to detract from that.
I invested in TTR for the long term and have been reasonably patient till now. I think I'm not alone in being rather excited by "Railway", and feel that several of us would be disappointed if it didnt pan out. Hence my present impatience for news. I could live with it, certainly, BUT.....what would I do with the trailer load of peanuts I bought for the elephants?
I ran the ann. past someone else, someone well versed in these things, and he agreed it wasnt a "done deal" until confirmed by drilling simply because we didnt know some of the intricate details of the sampling especially in the comparison to the Trillogy "footprint". Hence my bit of anxiety till all is revealed. It's a bit like a flier watching a cropduster suddenly pull up vertically from ground level and do a stall-turn at low altitude......he would feel a bit of anxiety till the guy was positively flying again, where a non-flier would would just watch with admiration.
And its back to fingers & eyes crossed.....waiting....lol.
GZ
Add to My Watchlist
What is My Watchlist?