TVN 0.00% 5.6¢ tivan limited

and now for something completely different...., page-4

  1. dt7
    2,859 Posts.
    lightbulb Created with Sketch. 97
    23/2/15 Announcement

    Holes have been sited to test the rock strength in the region of the pit walls
    to allow the calculation of final pit slope angles, which is required for the
    overall reserve sign off by Snowden.
    The drill core will be geotechnically logged and approximately 200 samples
    will be collected for geotechnical analysis with several hundred individual
    tests to be conducted to determine the strength of the wall-rocks surrounding
    the deposit.
    The core will also be geologically logged with mineralised intervals sampled.
    Three of the holes along the eastern margin of the Mount Peake resource
    are expected to intersect mineralisation, and these holes will be assayed to
    complement the resource drilling completed in late 2012. These assay
    results will be reported when available, and could potentially add to the
    existing Mount Peake resource estimate.
    Drilling is expected to be completed in March, with the geotechnical results
    to be announced as part of the Feasibility Study mining report to be
    delivered by mid-year, and the sample results for V-Ti-Fe mineralisation and
    subsequent analytical results to be reported when available.

    So I guess we wait until DFS.
 
watchlist Created with Sketch. Add TVN (ASX) to my watchlist
(20min delay)
Last
5.6¢
Change
0.000(0.00%)
Mkt cap ! $96.48M
Open High Low Value Volume
5.5¢ 5.6¢ 5.4¢ $26.84K 488.5K

Buyers (Bids)

No. Vol. Price($)
2 40557 5.5¢
 

Sellers (Offers)

Price($) Vol. No.
5.6¢ 162954 3
View Market Depth
Last trade - 16.10pm 26/07/2024 (20 minute delay) ?
TVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.