I also would be in favour of a small raising @ 80c ps to keep 100% of Grieve.
Grieve 39A was drilled as an injection well. I would be surprised if ELK decides to produce from this well as I am not sure if they can do both? Wouldnt they use Grieve 39 as the production well?
DJ