MEO 0.00% 0.0¢ meo australia limited

Hi AllInteresting timing that nt/p69 drilling plan released...

  1. 1,073 Posts.
    lightbulb Created with Sketch. 43
    Hi All

    Interesting timing that nt/p69 drilling plan released conoco phillips today post my post yesterday - all just chance.

    I will respond to tonik's post another day.

    Nt/p69 t now commence in August 2013 if the maths holdctrue in the enviro summary released today:

    "The drilling program is scheduled to commence in Quarter 3 2013 (subject to weather and drill rig availability) and conclude by Quarter 4 2014 i.e. over a 12 -14 month period. Active drilling of each hole is planned to take approximately 40 days, with 104 days in total being spent at each location."

    The remarkable inclusion in the enviro summary, which really didn't need to
    Be included, which was:..........

    "There are a number of oil and gas companies holding petroleum permits in the vicinity of the drilling area. These include:
    ? The Abadi – Inpex Masela (Indonesia) project, in progress.
    ? MEO Australia’s proposed Methanol plant to be located at Tassie Shoal".

    As well as:

    "The location is adjacent to several undeveloped gas resources in the region, including the Blackwood and Heron discoveries in the nearby NT/P68 exploration permit (MEO 50%, with Eni)."
    ? The Evans Shoal gas discovery, operated by Shell, lies directly adjacent to NT/P69.


    All just by chance....

    Good night.

    Adl
 
watchlist Created with Sketch. Add MEO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.