Ann: 10.02.11 CTP Exploratoin Date , page-6

  1. 8,112 Posts.
    lightbulb Created with Sketch. 73
    COM,

    "they are improving their level of PR, something that was somewhat lacking prior"

    I agree that they are improving the level of PR, My comments were that the anny really did not tell us anything that we did not already know was going to happen.

    The comments " The 1385km 2009/2010 Amadeus and Pedirka Basins Seismic Survey commenced with line surveying on Dec 7th 2009 in the Johnstone area of permit EP-115. To date approximately 40% of this line clearing phase of the survey has been completed." were welcome, but not erath shattering.

    I rather enjoyed reading "Central has called for expressions of interest from drilling contractors for the drilling of between 3 to 6 conventional wells commencing as soon as possible but dependent on the availability of appropriate equipment and joint venture deliberations."
    " Ooraminna 2 in EP 82, a 300 km2 surface anticline with potential to host up to 2 TCFG in UGIIP at high estimate."

    And that may mean that they are going to drill earlier than we thought.

    That again is welcome, but the anny is really Ladies and Gents we are working towards drilling various pre agreed locations.

    We already knew most of those things.

    CB
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
4.9¢
Change
0.000(0.00%)
Mkt cap ! $36.26M
Open High Low Value Volume
4.9¢ 4.9¢ 4.8¢ $6.378K 131.3K

Buyers (Bids)

No. Vol. Price($)
3 239074 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 59455 1
View Market Depth
Last trade - 16.10pm 23/07/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.