re: Ann: 10.04.19 Prefeasibility on Helium Ex... advised that subject to the discovery and proving of sufficient reserves and flow rates, relatively low volumes of helium may be commercially extracted and sold from the Company?s interest areas in central Australia via the utilisation of field based modular extraction plants coupled with centralised purification and liquefaction plants.
The Company is basing its assertions on a report (The Report) tendered to it by M.E.T.T.S. Pty. Ltd., Duncan Seddon and Associates Pty. Ltd. and NEGOTIACTION Pty. Ltd.
Dependent on quality, volumes and prices of helium and whether the product is sold FOB Darwin or CIF to a nominal North Asian destination the main conclusions of the Report are that:
There is a robust international market for helium which sells at bulk wholesale prices for up to AU$200/thousand cubic feet equivalent (Grade A 99.99% pure, liquid form)
Global average helium prices are expected to rise at 5-6% per annum for the next ten years
Annual demand growth has risen as high as 16% in China in recent years and with no expected domestic commercial production China is likely to remain dependent on imported helium
About one third of the world?s demand for helium recently was supplied from the US Federal Reserve which is expected to only last for a further 10-15 years
Estimates of new extraction plants required vary from 11 to 19 by the year 2020 at an estimated 5-6% per annum projected growth in demand
Asia is the fastest growing helium market in the world with total sales of 1,130 million cubic feet projected for the year 2010, up from 596 million cubic feet in 2005
Total global demand for helium is in excess of 6,000 million cubic feet per annum
Demand growth is primarily being driven by the electronics industry (particularly in flat panel display production) while fourth generation gas cooled nuclear plants are projected to add significantly to demand growth (benefitting from helium?s ability to contribute to increase electrical efficiency from 30% to 50% as well as safety and environmental considerations).
The capital expenditure (capex) of a commercial helium extraction plant processing 20 million cubic feet per annum of total gas feedstock, inclusive of owners? costs, royalties, equity finance, commissions, insurance and other costs associated with plant and ancillary equipment would be about AU$420 million
The operating expenditure (opex) would vary between AU$33-38 million per annum
The gross revenue would vary from AU$98-$143 million
The net present value (NPV) of such a project at an 8% discount rate could range between AU$111 and AU$556 million
Considerable savings in capex of up to 30% could be achieved if plant component manufacturers fabricate in Asia. Further savings could be achieved if the plant is replicated and or higher throughputs are achievable.
The Report?s conclusions are based on the assumptions that gas of a similar composition to that found in the Magee 1 well is discovered and a subsequent field or fields produced at a total of 20 million cubic feet per day of total gas (inclusive of all gaseous components).
It is envisaged that helium would be extracted, liquefied and exported via Port Darwin. With respect to liquefaction mini-LNG plants would produce LNG, minor LPG and condensate with the product sold to the local transport market.
Central, with its Joint Venture Participant, He Nuclear Ltd, plans conditionally to drill at least one well during 2010 (The Magee 2 well) targeting gas, condensate and helium. Within the He Nuclear Joint Venture prospect blocks there are two seismically defined prospects. The Magee prospect may host up to 800 billion cubic feet of gas (BCFG) and up to 15 billion cubic feet of helium in undiscovered gas initially in place (UGIIP) . The Mt Kitty prospect may host up to 3 trillion cubic feet of gas (TCFG) and up to 185 billion cubic feet of helium UGIIP. The Magee prospect was drilled in 1992 and produced a flow of gas to surface that included 6.2% helium, gas and condensate credits. The estimates quoted above relate to undiscovered gas initially in place (UGIIP) and is at the ?high? estimate.
The geology of the Mt Kitty and Magee prospects is thought to be similar to known helium producing provinces in the world. They consist of a potential reservoir formation immediately underlain by a thick granitic basement and overlain by a thick layer of salt with efficient sealing qualities.
- Forums
- ASX - By Stock
- CTP
- Ann: 10.04.19 Prefeasibility on Helium Extraction
Ann: 10.04.19 Prefeasibility on Helium Extraction, page-2
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
-0.001(1.85%) |
Mkt cap ! $40.98M |
Open | High | Low | Value | Volume |
5.5¢ | 5.5¢ | 5.2¢ | $47.78K | 873.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 99825 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 561705 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 99825 | 0.053 |
4 | 383220 | 0.052 |
5 | 586685 | 0.051 |
2 | 265000 | 0.050 |
3 | 40418 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 561705 | 2 |
0.056 | 22321 | 1 |
0.058 | 100000 | 1 |
0.060 | 99559 | 2 |
0.062 | 11500 | 1 |
Last trade - 16.10pm 19/11/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |