CTP 1.85% 5.3¢ central petroleum limited

Ann: 10.08.03 Ooraminna 2 Drilling Update , page-3

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 64 Posts.
    Note : The largest portion of the greater Ooraminna structure lies within EPA 147, currently the subject of an application to the Central Land Council to re-commence negotiations.
    Following the setting of cement surface plugs, the drilling rig will now be rigged down and shifted to the next well in the programme, Johnstone West 1.
    Ooraminna 2 was the first well in a planned 3-4 well programme for 2010 including the 500 MMbbl oil (?high? estimate UOIIP) Johnstone West 1 prospect and the 800 BCFG (?high? estimate UGIIP) and 15 BCF helium (?high? estimate UGIIP) Magee 2 well.
    Road works and drilling pad preparation for the spudding of Johnstone West 1 and the supply of casing and relevant hardware has largely been completed and it is anticipated that the well will spud on or about the 14th August 2010.
    Central is Operator and holds a 100% interest and in EP 82, through wholly-owned subsidiary Helium Australia Pty Ltd. Ooraminna 2 is located at Latitude 24 degrees 01 minutes 05.83 seconds South, Longitude 134 degrees 10 minutes 10.95 seconds East.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.001(1.85%)
Mkt cap ! $39.49M
Open High Low Value Volume
5.3¢ 5.3¢ 5.2¢ $4.152K 78.33K

Buyers (Bids)

No. Vol. Price($)
1 90146 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.4¢ 37507 2
View Market Depth
Last trade - 12.41pm 12/11/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.