It also paves the way to filling the plant.
Struggling up to 40% capacity processing 1.4mt of 1.05%cu will deliver about $76m of free cash flow per annum at ES2 costs if we got there. With a three year mine life that has a value of about 10c a share. @3x cash flow.
Getting up to 2mt tonnes per annum increases cash flow to around $112m pa
The main prize is getting up to 3.3mt pa and generating $192m of free cash flow per annum with a 30yr mine life from the near mine targets.
That would get us in the big league and the possibility of trading at a sector average PER of 13.
Nice to see a Sp of $1.15 and dividends flowing in the not too distant future travelling on the very fast train.
Much better than farting around at 10c with a long and torturous journey and delayed dividends on the slow train to an undiluted $1.25.
Might even get a take over offer from BHP at a PER of 48 like OZ minerals up the road did.
- Forums
- ASX - By Stock
- Ann: $10 Million Placement To Fund Mine Extension Drilling
It also paves the way to filling the plant.Struggling up to 40%...
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.7¢ |
Change
-0.002(4.08%) |
Mkt cap ! $98.49M |
Open | High | Low | Value | Volume |
5.0¢ | 5.0¢ | 4.7¢ | $109.8K | 2.239M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 85719 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.8¢ | 242680 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 85719 | 0.047 |
6 | 553738 | 0.046 |
6 | 327198 | 0.045 |
3 | 352010 | 0.044 |
3 | 572000 | 0.043 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 94578 | 1 |
0.051 | 266535 | 2 |
0.052 | 50000 | 1 |
0.053 | 400217 | 4 |
0.054 | 962730 | 1 |
Last trade - 16.10pm 09/09/2024 (20 minute delay) ? |
Featured News
HGO (ASX) Chart |