It also paves the way to filling the plant.
Struggling up to 40% capacity processing 1.4mt of 1.05%cu will deliver about $76m of free cash flow per annum at ES2 costs if we got there. With a three year mine life that has a value of about 10c a share. @3x cash flow.
Getting up to 2mt tonnes per annum increases cash flow to around $112m pa
The main prize is getting up to 3.3mt pa and generating $192m of free cash flow per annum with a 30yr mine life from the near mine targets.
That would get us in the big league and the possibility of trading at a sector average PER of 13.
Nice to see a Sp of $1.15 and dividends flowing in the not too distant future travelling on the very fast train.
Much better than farting around at 10c with a long and torturous journey and delayed dividends on the slow train to an undiluted $1.25.
Might even get a take over offer from BHP at a PER of 48 like OZ minerals up the road did.
- Forums
- ASX - By Stock
- Ann: $10 Million Placement To Fund Mine Extension Drilling
It also paves the way to filling the plant.Struggling up to 40%...
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.4¢ |
Change
0.001(1.59%) |
Mkt cap ! $134.1M |
Open | High | Low | Value | Volume |
6.2¢ | 6.5¢ | 6.2¢ | $293.7K | 4.644M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 333000 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 190100 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 333000 | 0.063 |
3 | 1129031 | 0.062 |
4 | 252709 | 0.061 |
6 | 300239 | 0.060 |
2 | 115000 | 0.059 |
Price($) | Vol. | No. |
---|---|---|
0.064 | 190100 | 1 |
0.065 | 265615 | 2 |
0.066 | 35166 | 2 |
0.067 | 31720 | 2 |
0.068 | 467149 | 5 |
Last trade - 16.10pm 02/10/2024 (20 minute delay) ? |
Featured News
HGO (ASX) Chart |