DTR 9.09% 1.0¢ dateline resources limited

Ann: 100 metres of 4.16g/t Au Colosseum Gold Project, page-29

  1. 98 Posts.
    lightbulb Created with Sketch. 33
    50 degres? thats shallow when you are trying to get to a pipe that is in the middle of the pit and the pit has over 50m of water covering it

    Any shallower and they would be driling into water and any deeper they wouldn't even make the breccia pipe....
 
watchlist Created with Sketch. Add DTR (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
-0.001(9.09%)
Mkt cap ! $14.57M
Open High Low Value Volume
1.1¢ 1.1¢ 1.0¢ $51.37K 5.062M

Buyers (Bids)

No. Vol. Price($)
1 50000 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 118800 2
View Market Depth
Last trade - 10.12am 07/06/2024 (20 minute delay) ?
Last
1.0¢
  Change
-0.001 ( 9.09 %)
Open High Low Volume
1.0¢ 1.1¢ 1.0¢ 4991200
Last updated 10.18am 07/06/2024 ?
DTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.