Regarding the 2mtpa production rate constraint:
I don’t think 2mtpa will be a constraint. The higher capital case included money to build bypass roads around towns. Once complete then there is scope to push beyond 2mtpa road haulage.
However in the longer term when we start grinding up magnetite ore, a slurry pipeline may be the best solution for the green steel product. This could have much higher capacity and lower capital than a rail line or road duplication. It would also have very low operating costs.
- Forums
- ASX - By Stock
- Ann: 10km Magnetic Strike at Satrokala Iron Ore Project
Regarding the 2mtpa production rate constraint:I don’t think...
Featured News
Add AKO (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.06M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 43635 | 12.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.5¢ | 73965 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 43635 | 0.120 |
1 | 70000 | 0.115 |
1 | 100000 | 0.100 |
1 | 100000 | 0.090 |
1 | 150000 | 0.087 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 73965 | 1 |
0.135 | 40004 | 1 |
0.150 | 99796 | 4 |
0.155 | 36055 | 1 |
0.160 | 63967 | 1 |
Last trade - 16.12pm 13/11/2024 (20 minute delay) ? |
Featured News
AKO (ASX) Chart |
Day chart unavailable
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online