HMX 2.78% 3.7¢ hammer metals limited

Ann: 11m at 5% Copper & 2.5g/t Gold near Significant EM Conductor, page-140

  1. 119 Posts.
    lightbulb Created with Sketch. 37
    On March 23rd we were told assays were due in 7 - 10 days. We're 8 days on. They could arrive back from the labs as late as Monday 4th, assuming a day to write up a release we will see these by Tuesday latest.
 
watchlist Created with Sketch. Add HMX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.