Lol
results are a yawn to me. They have no roads, no infrastructure, no processing plant , no permits
Only thing they have is plenty of water and assays that is irrelevant for another decade because thats how long it will take them to do anything with this deposit
- Forums
- ASX - By Stock
- PMT
- Ann: 126.3m @ 1.66% Li2O in First Batch of 2024 CV5 Drill Results
Ann: 126.3m @ 1.66% Li2O in First Batch of 2024 CV5 Drill Results, page-6
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add PMT (ASX) to my watchlist
(20min delay)
|
|||||
Last
43.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $262.6M |
Open | High | Low | Value | Volume |
44.0¢ | 44.5¢ | 42.0¢ | $1.005M | 2.306M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 43.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
44.0¢ | 64991 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 0.430 |
1 | 45550 | 0.425 |
2 | 3550 | 0.420 |
1 | 100000 | 0.415 |
1 | 3622 | 0.410 |
Price($) | Vol. | No. |
---|---|---|
0.440 | 6760 | 1 |
0.445 | 50000 | 2 |
0.450 | 15000 | 2 |
0.455 | 1300 | 1 |
0.465 | 167216 | 4 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
PMT (ASX) Chart |