ASN's Lithium project might still be viable with lower lithium grade with the following economic contributions:
1. Natural gas from existing CC well for electric generation.
2. Numbers of bi-product.
3. Low capital cost for infra.
4. Low extraction cost due to high pressure.
However, I believe the chances of getting >200 ppm in the future explorations are higher with more claims at the southern areas which we believe where the high grade lithium was trapped.
Fundamental is getting stronger with only 30mil mc, upside is high with world class management.
GLTA DYOR
- Forums
- ASX - By Stock
- ASN
- Ann: 142 ppm Li Assay Result from Artesian Flow Horizon
Ann: 142 ppm Li Assay Result from Artesian Flow Horizon, page-38
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.4¢ |
Change
-0.001(1.33%) |
Mkt cap ! $100.2M |
Open | High | Low | Value | Volume |
7.6¢ | 7.6¢ | 7.4¢ | $152.1K | 2.044M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 222565 | 7.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.5¢ | 176934 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 184610 | 0.074 |
9 | 873452 | 0.073 |
11 | 768589 | 0.072 |
5 | 1310591 | 0.071 |
18 | 813233 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.075 | 176934 | 1 |
0.076 | 325000 | 2 |
0.077 | 149999 | 2 |
0.078 | 373962 | 1 |
0.079 | 583307 | 5 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |