The first side track was required due to poor service delivery and tool issues (Bakered). The 2nd side track was required as a result of hitting the high pressure gas leg in the lower angwa and needing to increase the mud weight which created poor conditions for sampling. Not sure how either of those things points towards a likely failed flow test
- Forums
- ASX - By Stock
- Ann: $15m raised to fund Well Test & Cabora Bassa Operations
The first side track was required due to poor service delivery...
-
- There are more pages in this discussion • 540 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $116.7M |
Open | High | Low | Value | Volume |
7.5¢ | 7.7¢ | 7.4¢ | $74.12K | 990.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 56930 | 7.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 12986 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 56930 | 0.074 |
2 | 39931 | 0.073 |
3 | 84432 | 0.072 |
3 | 89050 | 0.071 |
5 | 396817 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 12986 | 1 |
0.078 | 254968 | 4 |
0.080 | 153368 | 5 |
0.081 | 1000 | 1 |
0.082 | 72100 | 1 |
Last trade - 16.10pm 07/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |