  1. 52 Posts.
    lightbulb Created with Sketch. 24
    I wanted to clarify an issue. MK-2's total depth was called at 3,718m. The wireline logging program then commenced before MK-2 was developed hole issues.

    MK-2 Side-track's total depth was called at 3,360m. 13.9 metres of net pay was from the Upper Angwa after reaching intermediate total depth of 2,987m.

    So the remaining net pay of 21 metres (34.9 metres total less 13.9 metres) come from below 2,987m.

    The question is - is the 21 metres of net pay solely from the MK-2 sidetrack - so between 2,987m and 3,360m? Or does it include net pay from logging MK-2 - so between 2,987m and 3,718m? (If you could cite the source of your answer that would be appreciated).
 