IVZ 1.49% 6.8¢ invictus energy ltd

Ann: $15m raised to fund Well Test & Cabora Bassa Operations, page-693

  1. 51 Posts.
    lightbulb Created with Sketch. 24
    Thanks mate. Checked that and he said 3500m "ish." So the lowest ~200 metres of MK-2 weren't logged. I can't see anywhere which says how much, if any, of the 21m net pay in the Lower Angwa came from 3,360m - ~3,500m (i.e. the overpressure part of MK-2 that was logged). That would be interesting to know because it could give some indication of the net pay in the rest of the over-pressured part.

    When the 6 inch hole is drilled from the bottom of the MK-2 ST, is the logging process the same? Does the small hole width present difficulties with logging? Will they try and get samples from this section (is that possible in a 6 inch hole) or can they flow test so don't need samples?
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.