"When the 6 inch hole is drilled from the bottom of the MK-2 ST, is the logging process the same? Does the small hole width present difficulties with logging? Will they try and get samples from this section (is that possible in a 6 inch hole) or can they flow test so don't need samples? "
Most likely the plan would be to run a very basic set of logs....a single supercombo run. Possible second run with FMI and CMR. Standard sized tools can be run in 6" hole with adjustment to standoffs etc.
The MDT. There is no slimhole version of this tool. It can be run in 6" hole (some modules cant be run) but there is a significant increase in risk of getting stuck. I doubt they'll run MDT in the 6" hole.
- Forums
- ASX - By Stock
- IVZ
- Ann: $15m raised to fund Well Test & Cabora Bassa Operations
Ann: $15m raised to fund Well Test & Cabora Bassa Operations, page-695
-
-
- There are more pages in this discussion • 318 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
0.001(1.49%) |
Mkt cap ! $96.41M |
Open | High | Low | Value | Volume |
6.7¢ | 6.9¢ | 6.7¢ | $34.82K | 512.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 150899 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 131225 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 150899 | 0.068 |
1 | 150000 | 0.067 |
6 | 376496 | 0.066 |
5 | 893384 | 0.065 |
1 | 100999 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 131225 | 1 |
0.070 | 494994 | 5 |
0.071 | 370417 | 2 |
0.072 | 550000 | 2 |
0.073 | 460000 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |