I think the overlay occurred in a single quarter (within 2H23 - but was to account for cumulative economic changes that had happened over about a year), and applied to the full loan book, a 0.5% increase to total provisions. From around 6.1% to 6.6%.
So in 1H24, if the economy has not deteriorated since 2H23, then I'd expect the loan book to get off easy - no further overlay needed (since 6.6% should be conservative enough?). I think this half actually reported a downward adjustment in provisions, saying the economic expectations have improved (unemployment and IRs). So profit would be up from that adjustment - as seen in the lower provisions this half.
For FY23 - I think it's fairer to divide that overlay by at least the halves of the year, which brings the halves to a nice round $6m and $6m profit for the 2 halves (instead of $9m and $3m, if attributing the full overlay to H2).
So I'd call it $6m, $6m and $6m NPAT for the last 3 halves. But the contributing factors varied - overlays, lower NIM, then lower provisions. So it's still a bit hard to project going forward.
- Forums
- ASX - By Stock
- MME
- Ann: 1H24 Results Investor Presentation
Ann: 1H24 Results Investor Presentation, page-16
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MME (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
-0.006(8.82%) |
Mkt cap ! $49.60M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.2¢ | $160.1K | 2.467M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 44999 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.8¢ | 33973 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 44999 | 0.062 |
5 | 218565 | 0.061 |
4 | 570000 | 0.060 |
1 | 80000 | 0.059 |
3 | 222413 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.068 | 33973 | 1 |
0.069 | 20350 | 1 |
0.070 | 43500 | 2 |
0.071 | 21739 | 1 |
0.072 | 7712 | 1 |
Last trade - 16.10pm 15/05/2024 (20 minute delay) ? |
|
|||||
Last
6.6¢ |
  |
Change
-0.006 ( 2.94 %) |
|||
Open | High | Low | Volume | ||
6.8¢ | 6.8¢ | 6.4¢ | 194593 | ||
Last updated 15.56pm 15/05/2024 ? |
Featured News
MME (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online