STX 2.27% 21.5¢ strike energy limited

Hi All,To those who are in the industry, assuming the EPC for SE...

  1. 1,823 Posts.
    lightbulb Created with Sketch. 473
    Hi All,
    To those who are in the industry, assuming the EPC for SE gets squared away soon, how long of a time frame do we think before first production out of SE?

    There is talk in the presentation of "Development Envelope for Phases 1-3"; but I can't find the right previous presentation that talks about these phases. The latest presentation talks about the Enerflex FEED for 40TJ/d Phase 1; so I'm assuming that's the phase '1' of the 1-3 in the Development Envelope?

    Can anyone elaborate that understand the industry what those 3 phases are and what are the typical time frames to get them done? Does it mean at the end of Phase 3 we're piping/selling gas into the grid just like Walyering?
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
-0.005(2.27%)
Mkt cap ! $615.3M
Open High Low Value Volume
22.0¢ 22.5¢ 21.5¢ $1.177M 5.431M

Buyers (Bids)

No. Vol. Price($)
3 209301 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 127054 5
View Market Depth
Last trade - 16.10pm 06/05/2024 (20 minute delay) ?
Last
21.5¢
  Change
-0.005 ( 3.24 %)
Open High Low Volume
22.5¢ 22.5¢ 21.5¢ 1250462
Last updated 15.59pm 06/05/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.