SUM 0.00% 22.0¢ summit minerals limited

Ann: $2.5m Placement to Accelerate Drilling at Equador Project, page-154

  1. 547 Posts.
    lightbulb Created with Sketch. 58
    So sorting samples before sending for testing, which resulted in a result 3 to 4 times the previous samples taken, isnt cherry picking?
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
22.0¢
Change
0.000(0.00%)
Mkt cap ! $18.05M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 8959 25.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 10000 1
View Market Depth
Last trade - 10.03am 06/09/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.