No worries so let's use those figure work out how much Overburden
would have to be removed,
BEFORE WA1 makes a cent and hits Paydirt:
3.5km x 1.5km x 50metres.
That works out to
3500 x 1500 x 50 metres
which equals:
262 500 000 M3 of Overburden to be Removed !!!!
262.5 Million Tonnes approx. of Overburden to be removed.
That's a lot of work !!!!
Which would be very expensive.
But wait there's still more,
Clearly one cannot have vertical sides or it would collapse,
So needs to be increased by at least 50% to allow for the Taper Required:
That's 393 Million Tonnes Of Overburden to be Removed !!!!
Now how much do you think that would actually cost to do?
- Forums
- ASX - By Stock
- Ann: $2.5m Placement to Accelerate Drilling at Equador Project
No worries so let's use those figure work out how much...
-
- There are more pages in this discussion • 138 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SUM (ASX) to my watchlist
(20min delay)
|
|||||
Last
24.0¢ |
Change
0.010(4.35%) |
Mkt cap ! $20.23M |
Open | High | Low | Value | Volume |
21.5¢ | 25.0¢ | 21.5¢ | $73.42K | 314.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 49117 | 24.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
24.5¢ | 39538 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49117 | 0.240 |
1 | 20000 | 0.235 |
1 | 6000 | 0.230 |
1 | 1844 | 0.215 |
4 | 52380 | 0.210 |
Price($) | Vol. | No. |
---|---|---|
0.250 | 12500 | 1 |
0.255 | 110819 | 2 |
0.260 | 148967 | 3 |
0.265 | 5000 | 1 |
0.270 | 67738 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
SUM (ASX) Chart |