HIO 3.70% 2.6¢ hawsons iron ltd

Ann: 20 Mtpa BFS and MOU with Flinders Ports, page-125

  1. w27
    2,453 Posts.
    lightbulb Created with Sketch. 752
    I doubt that there is the capacity in Australia to build a welded steel pipeline several hundred kilometers long in much less than two years. Then there is the survey and design which will need to be completed, at least to a preliminary stage, before construction can start. Welded steel pipelines require welders of the highest standard who must complete a practical test before employment. They are pretty scarce in Australia and cannot be trained in the short term.
 
watchlist Created with Sketch. Add HIO (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
-0.001(3.70%)
Mkt cap ! $26.23M
Open High Low Value Volume
2.6¢ 2.7¢ 2.5¢ $78.10K 3.063M

Buyers (Bids)

No. Vol. Price($)
1 3399 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
2.8¢ 1114423 4
View Market Depth
Last trade - 16.10pm 17/07/2024 (20 minute delay) ?
HIO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.