speculator,
By 35% rigged up, I think this means that 35% of the rig has been transported to the site and assembled. Like a WIP report.
Some of the big land rigs can be 100+ truckloads so suggest they use trucking and other measures as a basis for % rigged up. Civil engineering such as well pad and pits would be done prior to the rig being transported to the site.
- Forums
- ASX - By Stock
- BPT
- Ann: 2012 Annual Report
Ann: 2012 Annual Report , page-4
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.47 |
Change
-0.050(3.29%) |
Mkt cap ! $3.353B |
Open | High | Low | Value | Volume |
$1.49 | $1.49 | $1.46 | $11.42M | 7.782M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 10000 | $1.47 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.48 | 75145 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 10000 | 1.465 |
10 | 117493 | 1.460 |
7 | 149016 | 1.455 |
22 | 389094 | 1.450 |
1 | 18106 | 1.445 |
Price($) | Vol. | No. |
---|---|---|
1.475 | 75145 | 6 |
1.480 | 151244 | 6 |
1.485 | 70543 | 4 |
1.490 | 53106 | 2 |
1.495 | 18106 | 1 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
BPT (ASX) Chart |