speculator,
By 35% rigged up, I think this means that 35% of the rig has been transported to the site and assembled. Like a WIP report.
Some of the big land rigs can be 100+ truckloads so suggest they use trucking and other measures as a basis for % rigged up. Civil engineering such as well pad and pits would be done prior to the rig being transported to the site.
- Forums
- ASX - By Stock
- Ann: 2012 Annual Report
speculator,By 35% rigged up, I think this means that 35% of the...
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
|
|||||
Last
$1.48 |
Change
-0.025(1.67%) |
Mkt cap ! $3.364B |
Open | High | Low | Value | Volume |
$1.48 | $1.49 | $1.47 | $10.35M | 7.007M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 274032 | $1.48 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.48 | 1057 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 211616 | 1.475 |
11 | 178794 | 1.470 |
3 | 84306 | 1.465 |
9 | 109199 | 1.460 |
4 | 111865 | 1.455 |
Price($) | Vol. | No. |
---|---|---|
1.480 | 1057 | 1 |
1.490 | 141933 | 7 |
1.495 | 196257 | 8 |
1.500 | 142338 | 6 |
1.505 | 75253 | 5 |
Last trade - 16.10pm 24/06/2024 (20 minute delay) ? |
Featured News
BPT (ASX) Chart |