from the website The Taronga Tin project is currently 100% owned by ASX-listed Aus Tin Mining (ANW). The asset has a JORC (2012) reserve of 22mt @ 0.16% Sn for 35,600t of contained tin. A Preliminary Feasibility Study (PFS) was recently completed for an open cut mine, generating up to 3ktpa of contained tin over a 9.3 year mine life. Initial capital for the mine was estimated at A$88m, with a C1 cash cost of A$17,935/t(sorry did miss the AUD) so 1334USD compared to C1 cash cost of US$9,176/tonne of tin for KAS.
- Forums
- ASX - By Stock
- KAS
- Ann: 2018 Achmmach Tin Project Definitive Feasibility Study
Ann: 2018 Achmmach Tin Project Definitive Feasibility Study, page-9
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)