DRE dreadnought resources ltd

Ann: 2019 FIELD PROGRAM COMMENCES AT THE TARRAJI-YAMPI PROJECT, page-4

  1. 658 Posts.
    lightbulb Created with Sketch. 42
    I think there’s is a lot to be excited about to where we have currently been sitting on this announcement alone, they are trying to tell us something without saying it directly.

    I see a lot of smiles from ear to ear, (look at that Cu min), a lovely ‘welcome to country’ with another couple of genuine smiles from ear to ear.

    A high probability of being open at depth over the whole of Chianti with epic grades due to that shelf and previousing drilling indicating a region of interest when overlayed with the EMS drone data map.

    An airborne EM survey flown in 2015 highlighted an EM conductor at depth beneath the 1972 ACM drilling. SGC is currently conducting a FLEM survey over Chianti with results expected late May 2019.

    Drilling approvals well advanced:
    o Heritage and environmental surveys planned for July 2019
    o Programme of Works lodged
    Drilling to commence in September 2019 quarter (confidence and timing)

    And the area has been locked up as a Milotary zone for the last 40 years at least.
    968A89EC-DC50-4DAF-9C16-79224D4F0C9B.png

    0EB3179A-4488-4DB3-A56F-ED79230C5CF0.png ECDE82D7-89B8-46E2-8800-BBC63FE4FE91.png AB7190E6-F7BA-425D-B81C-5024CAEDA52E.png
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $60.95M
Open High Low Value Volume
1.2¢ 1.2¢ 1.1¢ $19.63K 1.758M

Buyers (Bids)

No. Vol. Price($)
12 4120734 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 18571009 26
View Market Depth
Last trade - 16.10pm 01/08/2025 (20 minute delay) ?
DRE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.