Some points to note:
- project is marginal (15% post tax IRR at US$1.30/lb Zn and capex >> NPV). The sensitivity analysis (Table 3) indicates that NPV is materially negative at US$1.20/lb Zn
- location is challenging (to say the least), as this would be the most northernly mine developed/currently in operation. TMAC Resources Doris gold mine (Hope Bay, Nunavut) cost nearly US$1 billion to build in 2017 (and not as a remote location as IBG. plus with a gold mine you can fly the product out - you don't have the same concentrate logistic challenges)
- offtake is already committed (Glencore/Trafigura). I would suspect they are more than happy to see this project stay off market - as this will benefit their existing portfolio of zinc mines/smelters
- Forums
- ASX - By Stock
- Ann: 2021 BFS Confirms Citronen as World Class Zinc Project
Some points to note:- project is marginal (15% post tax IRR at...
-
- There are more pages in this discussion • 94 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IBG (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
-0.001(25.0%) |
Mkt cap ! $4.782M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $25.01K | 6.756M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 20700281 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 2008400 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 20033615 | 0.003 |
20 | 15205034 | 0.002 |
6 | 8799980 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 2000000 | 1 |
0.005 | 4317961 | 9 |
0.006 | 4860777 | 2 |
0.007 | 1101257 | 5 |
0.008 | 606448 | 3 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
IBG (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online