IBG 25.0% 0.3¢ ironbark zinc ltd

Some points to note:- project is marginal (15% post tax IRR at...

  1. 224 Posts.
    lightbulb Created with Sketch. 13
    Some points to note:

    - project is marginal (15% post tax IRR at US$1.30/lb Zn and capex >> NPV). The sensitivity analysis (Table 3) indicates that NPV is materially negative at US$1.20/lb Zn
    - location is challenging (to say the least), as this would be the most northernly mine developed/currently in operation. TMAC Resources Doris gold mine (Hope Bay, Nunavut) cost nearly US$1 billion to build in 2017 (and not as a remote location as IBG. plus with a gold mine you can fly the product out - you don't have the same concentrate logistic challenges)
    - offtake is already committed (Glencore/Trafigura). I would suspect they are more than happy to see this project stay off market - as this will benefit their existing portfolio of zinc mines/smelters


 
watchlist Created with Sketch. Add IBG (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
-0.001(25.0%)
Mkt cap ! $4.782M
Open High Low Value Volume
0.4¢ 0.4¢ 0.3¢ $25.01K 6.756M

Buyers (Bids)

No. Vol. Price($)
16 20700281 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 2008400 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
IBG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.