The report was dated Aug 2020 and we are already over a year past this report.
With the feasibility study due by end of FY2021 as stated in the above, perhaps DCN has fast tracked this piece of work and is already well advance into the development and mining of the mine?
Anyway to confirm on the above?
Cheers.
- Forums
- ASX - By Stock
- Ann: 2021 Mineral Resources and Reserve Update
The report was dated Aug 2020 and we are already over a year...
-
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)