Ten years at a minimum - there’s over 18mt of resource there...

  1. 3,264 Posts.
    lightbulb Created with Sketch. 2192
    Ten years at a minimum - there’s over 18mt of resource there above a 0.7% Sn cut off which at current throughput rates (~750ktpa) is circa 25 year mine life.

    Couple of things I picked up in the non fuss announcement.

    1. they added 2x the depleted tin at 60% of the tonnage - that is they depleted 820kt @ 1.25% Sn for 10kt Sn and replaced it with 500kt @ 3.95% Sn for 20kt Sn. This deposit is getting higher grade the deeper it goes. The economics of this step change in grade will be a complete game changer once the vent is in - despite the fact they have to haul longer distances.

    2. This was a annual compliant JORC but they’re clearly doing far more drilling evident by another JORC due before Q4 (not required under JORC reporting) to allow for an updated LOM plan and the rigs currently operating.

    3. The current tin price and outlook will influence the next LOM plan - increased throughput? High grading? Post the thermal upgrade scoping study - with the current 25yr resource life (plus rentails) there are many options to value add here.

    upload_2021-6-7_20-9-32.png
    Last edited by Cashmeoutside: 07/06/21
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
62.5¢
Change
-0.030(4.58%)
Mkt cap ! $553.9M
Open High Low Value Volume
66.0¢ 66.0¢ 61.0¢ $2.280M 3.628M

Buyers (Bids)

No. Vol. Price($)
4 86376 62.0¢
 

Sellers (Offers)

Price($) Vol. No.
62.5¢ 180867 5
View Market Depth
Last trade - 16.21pm 25/07/2025 (20 minute delay) ?
MLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.