Despite all the noise here, I think it should be said sometime what a great report worth reading the Strike Annual Report is!!!
It provides an excellent overview of all the projects and also explains why, for example, Project Haber was deprioritized and placed as a project at the end of the decade.
In addition, some new information. Among other things, that we have secured a total of 6 drilling slots for the Ensign rig (=> SE2, SE3, W7, SW Erregulla, Erregulla Deep and likely Wagina-1 before the SE production commences), the background of the planned Walyering-7 drilling or that the construction of the modular South Erregulla Production Facility is already scheduled to start by next July...
In any case a worthwhile reading recommendation...
- Forums
- ASX - By Stock
- STX
- Ann: 2023 Strike Annual Report
Ann: 2023 Strike Annual Report, page-66
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
23.0¢ |
Change
0.020(9.52%) |
Mkt cap ! $659.0M |
Open | High | Low | Value | Volume |
21.5¢ | 23.0¢ | 20.8¢ | $2.859M | 12.94M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 226888 | 22.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.0¢ | 4366669 | 32 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 226888 | 0.225 |
9 | 647654 | 0.220 |
10 | 1208008 | 0.215 |
16 | 1363547 | 0.210 |
33 | 1283157 | 0.205 |
Price($) | Vol. | No. |
---|---|---|
0.230 | 4366669 | 32 |
0.235 | 738380 | 17 |
0.240 | 1313046 | 16 |
0.245 | 723188 | 16 |
0.250 | 2080188 | 28 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |